Inspection and Documentation for Every Order

First-article inspection, material certificates, dimensional reports and traceability for machined parts — the records that defend a part in an audit.

Quality inspection of a machined part
First-article inspection and dimensional reporting.
Short answer

Inspection and documentation verify that a manufactured part matches its drawing before it reaches the customer. Xinyuanmu Precision performs first-article inspection on new part numbers, supplies material certificates and dimensional reports, and keeps records retrievable by part number and lot.

When this process applies

This capability covers the verification and paperwork that travel with the parts: incoming material checks, first-article inspection, in-process sampling and final dimensional reporting. It is what makes a shipment defensible in a quality audit.

Technical specifications

First-article inspectionOn every new part number
Material certificatesMill test reports available
TraceabilityHeat-number on request
Dimensional reportsPer lot / first article
RecordsRetrievable by part number and lot

Where it is the right choice

  • New part numbers requiring first-article verification
  • Orders where material traceability is contractually required
  • Low-volume, high-mix work where record accuracy matters
  • Buyers qualifying a new supplier

Where it is the wrong choice

Stating this explicitly matters more than a capability list: if your part falls into one of these categories, another process will cost you less.

  • Third-party certification we cannot issue (e.g. ISO/AS9100 certificates not yet held) — we state what we can and cannot provide
  • Non-destructive testing such as X-ray or ultrasonic — outsourced to certified partners
  • Metallurgical cross-sections and hardness mapping — outsourced

Equipment

  • Dimensional measuring equipment
  • Material certificate and heat-number tracking
  • Documented inspection and record system
Inspection & Documentation

Process questions

What documents ship with the parts?

Material certificates are available with shipments, and dimensional inspection reports accompany first-article parts. Heat-number traceability and additional documentation can be provided on request per your quality agreement.

Do you issue ISO or industry-system certificates?

We do not claim management-system certifications we do not yet hold. We provide the inspection and traceability records we actually perform, and we are transparent about which documents require a certified partner.

Send drawings, get a review and a quote

Send a STEP file and a 2D drawing. You get a fixed-price quotation with lead time and a written DFM note — no obligation, and no sales call unless you ask for one.